Hot Water Boiler for Greenhouses Use in Kazakhstan

  • Project: Hot Water Boiler for Greenhouses Use in Kazakhstan
  • Industry: Agriculture
  • Boiler Type: LHS/CLHS Series Vertical Type Hot Water Boiler
  • Boiler Model and Quantity: 6 sets of CLHS0.12-95/70 + 6 sets of CLHS0.47-95/70-YQ + 9 sets of V99
Hot Water Boiler for Greenhouses Use in Kazakhstan

On November 3 of 2021, a customer from Bulgaria completed the purchase of vertical hot water boiler 99kw, 120kw and 470kw for greenhouse heating in Kazakhstan, including Baltur burner, and a set of water treatment with double valves and double tanks.

The 470KW boiler is used for vegetable greenhouses heating. The fuel is natural gas, and the outlet/return hot water temperatures are 95/70°C.

Our customer completed the full payment immediately, meanwhile we also delivered all the goods and equipment in 7 days after receipt of the payment.

Hot Water Boiler for Greenhouses Use in Kazakhstan

Characteristics of LHS/CLHS series vertical type hot water boiler:

  • Mobile flue gas tube hat, easy to check the fire tube status of boiler;
  • Digital controller, friendly interface, multiple language options and man-machine conversation help to control the operation state of the boiler;
  • Anti-lockup protection function ensures more stable operation;
  • A spoiler lays inside the convention heating tube, which can slow down the flue gas flow and enhance the heat transfer;
  • High temperature insulation material has good effect on heat preservation, boiler efficiency up to 98%;
  • Convention heating part is composed of ultra speed flue gas cooling tube, which is made of silicon aluminum alloy and has 5 times bigger heat exchange area;
  • Multi-direction water inlet and outlet layout and easy installation are convenient for users;
  • Smoke chamber surface is sprayed with acid-proof coating to ensure boiler more durable;
  • There is electron anode rod in water storage part, protecting tank from chemical etching;
  • Intelligent control and touch screen make operation more convenient.
Hot Water Boiler for Greenhouses Use in Kazakhstan

If you want to visit this project on site, or contact our client to check the machine’s work performance, please contact us: WhatsApp:+8613838294337

Enterprise strength and service support

Integrating R&D, production, distribution, and service-providing into one enterprise, EVERED attaches great importance to communication with customers. We have established an after sales visit team consisting of more than 56 persons. On the one hand, they timely solve the problems that our customers encounter; on the other hand, they collect feedback and improvement recommendations from our customers, to correctly orient our development and research.

EVERED Several production bases for production Several production bases for production
EVERED Free budget analysis, program planning Free budget analysis, program planning
EVERED Service that exceeds expectations Service that exceeds expectations